# Scrum vs. Kanban for Research Projects

Scrum organizes research work into fixed-length cycles with defined roles and planning meetings, while Kanban organizes the same work as a continuous flow of tasks on a board with limits on how many things can be in progress at once. The rule of thumb is simple. Choose Scrum when your project has a deliverable that must arrive by a date, such as a grant progress report, a thesis chapter, or a manuscript submission. Choose Kanban when your work arrives unpredictably, such as samples, reviewer comments, data requests, and instrument time, and you want a system that absorbs that variability instead of fighting it.

Both methods come from agile software development, and both have migrated into academic and industrial laboratories because they answer a question every principal investigator eventually asks. How do I make progress visible without turning my week into a series of status meetings? This article explains each method on its own terms, compares them on the criteria that actually decide the choice, walks through worked scenarios, and ends with a research project plan template you can adapt.

## Why Agile Ideas Entered Research Project Management

Research project management inherited most of its habits from civil engineering and defense contracting. You write a plan, estimate each task, sequence the tasks, and then measure progress against the plan. That model works when the work is well understood in advance. It struggles when the work is discovery, because in discovery you frequently learn something in week three that invalidates the plan you wrote in week one.

Agile methods were built for exactly this problem in software. Rather than planning everything up front, an agile team plans a small slice of work, does it, inspects the result, and adjusts. A 2023 systematic review of agile practices in Internet of Things development, which screened 4,303 documents down to 60 relevant studies, found that Scrum was by far the most common methodology teams applied, used alone in 42.1% of the 38 reported system developments and combined with other methods such as eXtreme Programming, Kanban, and rapid prototyping in another 10.5% [1]. That review examined software systems rather than laboratory science, but it documents the pattern that research groups have followed. Scrum arrived first and arrived in force, and Kanban arrived as a lighter alternative or a companion practice.

The same pattern of adaptation continues at scale. A dataset characterizing agile tailoring across large organizations, drawn from a systematic mapping study covering 2015 through 2025, documents how enterprises adapt frameworks like Scrum and Kanban to fit their own structures rather than adopting them unchanged [2]. Research groups do the same thing, and the healthiest version of the scrum vs. kanban for research projects debate ends with a tailored hybrid rather than a purist choice.

## What Scrum Is

Scrum is a framework for getting complex work done in short, repeating cycles called sprints. A sprint is a fixed block of time, most often two weeks and at most one month, during which the team commits to a defined set of work. At the end of every sprint, the team demonstrates what it built and holds a retrospective on how it worked.

Scrum defines three roles.

1. **Product owner.** The person who decides what work matters most and maintains the ranked list of work. In a research group this is usually the principal investigator or the project lead.
2. **Scrum master.** The person who protects the process, removes blockers, and runs the ceremonies. In a small lab this is often a senior graduate student or postdoc, not a dedicated manager.
3. **Development team.** The people doing the work. In a research setting this is the students, technicians, and postdocs executing experiments or analyses.

All work lives in a single ranked list called the product backlog. Before each sprint, the team holds sprint planning and pulls items from the top of the backlog into a sprint backlog. The team then works only on the sprint backlog until the sprint ends. Each working day begins with a daily scrum, a stand-up meeting of roughly fifteen minutes where each person states what they did yesterday, what they will do today, and what is blocking them. The sprint closes with a sprint review, where the team shows finished work to stakeholders, and a sprint retrospective, where the team discusses its own process.

Three properties of Scrum matter most for research. First, the sprint creates a hard deadline, which converts vague long-term goals into concrete two-week commitments. Second, the sprint review creates a demonstration, which for research might be a figure, a validated protocol, or a dataset with quality checks passed. Third, the fixed sprint length lets the team measure its velocity, the amount of work it completes per sprint, which makes delivery dates predictable once a few sprints of history exist.

The cost is ceremony overhead. Scrum prescribes several recurring meetings, and a two-person collaboration reading an unused protocol can find the full framework heavy. Scrum also assumes the team can commit to a sprint's worth of work in advance, which is difficult when half your week depends on a cell line cooperating.

## What Kanban Is

Kanban is a method for managing work as a flow. The name comes from the Japanese word for signboard, and the method originated on Toyota factory floors before spreading to software teams. Kanban has no prescribed roles, no fixed cycles, and no required meetings. It has a board, a set of work-in-progress limits, and a commitment to making the work and its flow visible.

The kanban board is a set of columns, each representing a stage of work, with cards that move left to right. A minimal research board has four columns.

1. **Backlog.** Every known task, ranked, with no commitment attached.
2. **In progress.** Work that someone has physically started.
3. **Review or validation.** Work awaiting a second pair of eyes, such as code review, data QC, or protocol verification.
4. **Done.** Finished work meeting an explicit definition of done.

The central mechanism is the work-in-progress limit, often written WIP limit. Each column gets a maximum number of cards. If the "In progress" column has a WIP limit of four and four experiments are underway, nobody starts a fifth until one finishes. This rule feels strange the first time you enforce it, because scientists are trained to keep every lead warm. The limit exists because multitasking slows everything. A person with seven open tasks finishes all seven later than a person who finishes three first and then starts the next three.

The second mechanism is the pull system. Team members do not receive assignments pushed onto them. When a person has capacity, and the WIP rules allow it, they pull the top card from the upstream column. This makes overload visible and makes the queue itself the coordination tool, which reduces the need for assignment meetings.

Kanban's metrics are flow metrics. Lead time is the elapsed time from when a card enters the backlog as ready work to when it reaches done. Cycle time is the elapsed time from when work starts to when it finishes. Throughput is the number of cards finished per week. Because there are no sprints, work can enter the board at any time, so a reviewer comment, a contaminated culture, or an urgent core facility slot can be added and prioritized immediately without breaking anyone's commitment.

The cost is a loss of forcing functions. Kanban has no sprint review, no demo date, and no velocity number, so without deliberate leadership a Kanban board can drift, with tasks flowing gently forever and no milestone ever declaring itself finished.

## Side-by-Side Comparison

The table below is the core of the scrum vs. kanban for research comparison. It uses the standard definitions of each framework, not the informal hybrids many labs actually run.

| Criterion | Scrum | Kanban |
|--|--|--|
| Core question | What will we commit to finishing in the next fixed cycle? | How do we keep work flowing without overload? |
| Cadence | Fixed-length sprints, typically two weeks | Continuous, no fixed iteration length |
| Roles | Product owner, scrum master, development team | No prescribed roles |
| Planning event | Sprint planning before each sprint | Ongoing, replenishment as capacity opens |
| Change mid-cycle | Discouraged, new work waits for the next sprint | Encouraged, new work enters the backlog anytime |
| Work unit | Sprint backlog items drawn from the product backlog | Individual cards on a board |
| Key metric | Velocity, work completed per sprint | Lead time, cycle time, throughput |
| Required meetings | Daily scrum, sprint planning, sprint review, retrospective | None prescribed, often a weekly board walk |
| Deadline predictability | Strong after a few sprints of history | Estimated from flow data, weaker at short horizons |
| Overhead | Higher, ceremonies every sprint | Lower, mostly the board itself |
| Best fit | Projects with fixed milestones and dedicated teams | Projects with unpredictable inflow and shared people |
| Main failure mode | Ceremony fatigue and failed sprint commitments | Endless flow with nothing ever declared done |

## When to Use Scrum

The secondary keyword "when to use scrum" deserves a direct answer, because the decision is more specific than many guides admit. Use Scrum when three conditions hold at the same time.

**Condition one, a date exists.** Scrum earns its overhead when someone outside the team is waiting for a deliverable on a calendar. Grant renewal progress reports, dissertation committee meetings, abstract deadlines, regulatory submissions, and scheduled facility time all create dates. Sprints convert those dates into weekly reality checks. If no external date exists for months, the sprint review has nothing to review against, and its value collapses.

**Condition two, the team is dedicated and small.** Scrum was designed for teams of roughly three to nine people who can commit most of their time to the project. A lab where five people each split attention across three projects cannot make honest sprint commitments, and failed commitments corrode the process faster than any other failure. Scrum works well for a focused subteam, for example three students plus a postdoc driving one manuscript to submission, even if the wider lab runs differently.

**Condition three, the work can be decomposed.** Sprint planning requires breaking the goal into items completable within one sprint. "Understand the mechanism" cannot be a sprint item. "Complete dose-response series for compound X on the WT line and produce a fitted curve" can be. Projects where decomposition is possible, including experimental campaigns, analysis pipelines, and writing projects with defined sections, fit Scrum. Exploratory projects where nobody can guess next week's task fit poorly.

A practical benefit deserves emphasis. Sprint retrospectives are the single most effective structure a research group can adopt for process improvement, because they create a protected fifteen minutes where the team asks what worked and what did not, and because the answers feed the next sprint's plan rather than a suggestion box nobody reads. Groups that adopt nothing else from Scrum should still adopt the retrospective.

## When to Use Kanban

Use Kanban when your defining constraint is variability in what arrives. Most service-heavy research roles are Kanban-shaped. A core facility manager, a [bioinformatics analyst](/blog/careers/how-to-become-a-bioinformatics-analyst-skills-education-and-career-path) supporting several labs, a research software engineer, and a [clinical research coordinator](/blog/careers/clinical-research-coordinator-career-path-from-entry-level-to-management) all face the same structure. Requests arrive continuously, priorities shift daily, each request is small, and no single request can be scheduled two weeks ahead with confidence. For these roles, a sprint commitment is fiction, and the difference between Scrum and Kanban for research of this type is decisive.

Kanban also suits individual researchers better than Scrum does. A solo scientist cannot staff the three Scrum roles meaningfully, but a solo scientist can run a personal kanban board with three columns and a WIP limit of two. The WIP limit does most of the work, because it forces an explicit choice about what to finish before starting something new, which is the discipline most productivity systems fail to supply.

Finally, Kanban is the better choice when work spans multiple projects or multiple supervisors. Scrum assumes one product backlog with one ranking. Kanban boards handle competing sources of work naturally, using either separate swim lanes per project or explicit priority classes, for example an expedite lane for genuinely urgent items with a strict limit of one card at a time.

## The Criteria That Decide Real Choices

![Decision path asking whether a date exists, whether the team is dedicated, and whether work can be split, ending in Scrum, Kanban or a hybrid.](/article-images/illustrations/scrum-vs-kanban-for-research-method-triage.webp)

When a lab asks whether to use scrum or kanban for research, the honest answer comes from five questions.

**Who is waiting, and when?** If an external stakeholder expects a demonstrable result on a date, Scrum's sprint review and velocity give you a defensible answer to "will it be ready." If nobody is waiting on a date, Kanban's lighter structure costs less.

**How predictable is the work?** Experimental protocols that behave reliably can be estimated and committed, which supports sprints. Work that fails unpredictably, such as animal studies with variable cohort outcomes or instrument time with queue variance, defeats sprint commitments and favors flow.

**Do people switch contexts constantly?** Context switching is the enemy of both methods, but Scrum's answer, dedicating a team to one sprint, is unavailable to most academic personnel. If your people must context switch, Kanban at least makes the switching visible on the board.

**How large is the group?** A team of one or two runs Kanban easily and Scrum awkwardly. A team of five to nine running one project is the Scrum sweet spot.

**What does leadership need to see?** If your funder or department head wants a burn-down chart and a date estimate, Scrum produces them. If leadership wants to see where requests sit and why turnaround takes as long as it does, a Kanban board with cumulative flow answers directly.

## Worked Scenarios

### Scenario one, a wet-lab thesis project

A doctoral student has eighteen months to complete experiments for a dissertation with three aims, and a committee meeting in month six. This is textbook Scrum territory. The three aims form the product backlog, ranked by the student and advisor. Sprints run two weeks, and each sprint contains items like "optimize western blot transfer conditions for protein Y" or "complete three biological replicates of the migration assay." The sprint review becomes a standing figure-meeting with the advisor, which doubles as mentorship and prevents the classic failure of a student disappearing for months. Velocity emerges after four sprints and tells the student whether aim three fits in the remaining time or whether the scope must shrink now rather than in the final month.

### Scenario two, a shared bioinformatics core

A research computing analyst supports nine labs. Requests arrive by email and ticket, sizes range from a two-hour data format conversion to a multiweek pipeline build, and priorities reshuffle whenever a grant deadline approaches. Sprints would fail here because the analyst cannot refuse an urgent request for two weeks on the grounds that it is not in the sprint backlog. Kanban fits. The board has columns for triage, in progress with a WIP limit of three, awaiting user feedback, and done. An expedite lane with a WIP limit of one exists for genuinely blocking requests. Lead time per request type becomes measurable, which turns the inevitable "why is this taking so long" conversation into a data conversation. This is the pattern the agile tailoring literature describes, where practitioners adapt frameworks to organizational reality rather than adopting them wholesale [2].

### Scenario three, a multi-investigator grant project

A five-person collaboration across two institutions has a three-year award with annual reporting. The project has defined milestones, but the two institutions have different rhythms. The fit here is hybrid. The collaboration runs quarterly milestone reviews modeled on sprint reviews, giving funders the predictability of Scrum's cadence. Within each site, daily work runs on Kanban boards, absorbing the unpredictable experimental reality. Milestones decompose into board work, and the flow data from the boards feeds honest quarterly reporting. Large-scale agile practice supports exactly this kind of compositional tailoring, where the coordination layer and the working layer use different mechanisms [2].

## A Research Project Plan Template

The keyword cluster includes "research project plan template," and both frameworks supply the skeleton for one. The template below is deliberately framework-neutral so you can run it as a Scrum backlog, a Kanban board, or both. Fill it in once at project start and revise it at every review.

1. **Objective statement.** One sentence stating what will exist at the end of the project that does not exist now. "A validated, replicated dataset showing that X modifies Y, sufficient for a manuscript in Z."
2. **Deliverables list.** The concrete artifacts. Figures, datasets, protocols, code repositories, the manuscript, the thesis chapter, the report to the funder.
3. **Milestone calendar.** The external dates. Committee meetings, abstract deadlines, reporting dates, facility windows. These dates drive everything else.
4. **Work breakdown.** Each deliverable decomposed into tasks small enough to finish in one to two weeks. If a task needs three months, split it.
5. **Ranking.** Order the tasks by what unblocks the most downstream work. In research, this usually means riskiest and most uncertain experiments first, because a failed high-risk experiment early is recoverable and the same failure late is not.
6. **Definitions.** A definition of ready, meaning what a task needs before someone starts it, such as reagents on hand and approval secured, and a definition of done, meaning what finished means, such as data quality checks passed and raw files archived.
7. **Board columns and WIP limits.** The stages work moves through and the maximum concurrent tasks per stage.
8. **Review cadence.** When you will inspect progress and against what. Weekly self-review for solo work, sprint reviews for teams, milestone reviews for funded collaborations.
9. **Risk register.** The top five things that could invalidate the plan, each with the earliest experiment that would reveal it.

On a Scrum run, items four through seven become the product backlog and sprint backlogs, and item eight becomes the sprint review. On a Kanban run, item four populates the board, item five sets the board's ranking, and item seven sets the WIP limits. The template is the same. The operating system differs.

## Evidence From Adjacent Domains, Read Carefully

Because agile methods were formalized in software, most controlled evidence about them comes from software settings, and a careful reader should weigh that when transferring findings to laboratories. The transfer is still informative. Research software and computational pipelines sit squarely inside the software domain, and the 2023 review of agile in Internet of Things systems found Scrum dominant both alone and in combination, which mirrors what research groups report informally [1]. The tailoring dataset covering 2015 through 2025 documents that even large enterprises with mature agile programs customize Scrum, Kanban, and scaled frameworks rather than running them by the book, and it catalogs the challenges, impacts, and metrics they use to judge success [2]. The lesson for a research group is that the framework is a starting scaffold. Expect to adapt it within your first quarter, and treat the retrospective or the periodic board review as the mechanism that does the adapting.

## Hybrid Approaches, Including Scrumban

![Three-column comparison of Scrum, Kanban and Scrumban across cadence, roles, change mid-cycle, key metric and main failure mode.](/article-images/illustrations/scrum-vs-kanban-for-research-scrum-kanban-fit.webp)

The most common real-world answer to scrum vs. kanban for research projects is a hybrid, often called Scrumban. The typical arrangement keeps Scrum's cadence and Kanban's flow discipline.

A common configuration runs two-week sprints for planning and review purposes, while the board itself uses WIP limits and pull rather than assignment. New urgent work can enter mid-sprint through the expedite lane, but the entry is visible and counted, and if expedited work repeatedly consumes a large fraction of each sprint, the team sees that data at the retrospective and responds. Teams in this arrangement often keep the sprint review and the retrospective, which are Scrum's highest-value ceremonies, and drop or shrink the daily scrum, replacing it with a twice-weekly board walk.

This combinatorial behavior is documented in the software literature. The IoT review noted that teams combined Scrum with Kanban, eXtreme Programming, and rapid prototyping rather than running Scrum alone [1], and the large-scale agile tailoring dataset treats framework combination as a normal object of study rather than a deviation [2]. For research groups, the practical guidance is to adopt the mechanisms that solve your actual problems. If your problem is deadline drift, adopt the sprint review. If your problem is overload, adopt WIP limits. If your problem is invisible progress, adopt the board. You do not need the whole framework to get the mechanism.

## Choosing a Tool

Both methods run on a whiteboard with sticky notes, and many lab boards should stay there, because physical boards are visible to everyone who walks past and require no login. Distributed teams need software. Any general-purpose project tool supports both methods, since Scrum and Kanban differ in operating rules rather than in software requirements. A tool supports Scrum if it can hold a ranked backlog, group items into iterations, and report velocity. A tool supports Kanban if it can enforce column WIP limits and report lead time and cycle time. Choose the tool your team will actually open daily, because an unused perfect tool loses to an imperfect used one.

## Common Mistakes and Limitations

These are the errors that most often derail agile adoption in research settings.

**Running Scrum with a part-time, multi-project team.** Sprint commitments require dedicated capacity. When team members split attention across three projects, they fail sprints, learn that commitments are decorative, and stop planning honestly. Either dedicate a subteam or run Kanban.

**Confusing the board with the method.** A kanban board without WIP limits is a to-do list, not Kanban. A Scrum team that skips retrospectives has meetings, not Scrum. Each framework's power sits in one or two mechanisms, and adopting the visible furniture without the mechanism produces no benefit.

**Writing sprint items that are too large.** "Analyze the dataset" is not a sprint item. "Run the normalization script on the cohort and produce the QC report" is. If an item cannot plausibly finish within the sprint, split it before planning, not after failing.

**Allowing the WIP limit to be a suggestion.** The value of the limit comes from the discomfort it creates. When the column is full, someone must finish something. Teams that quietly raise the limit whenever it is inconvenient have abandoned the method while keeping the wall chart.

**Ignoring the difference between experiments and tasks.** An experiment whose outcome is unknown is not a task that can be promised. Scrum handles this by framing the item as the attempt with its analysis, not the result. A sprint item can be "run the pilot and report the result," whether the result is positive or negative, and that item is always completable.

**Expecting flow metrics to measure scientific quality.** Lead time and throughput measure process, not discovery. A fast sprint that produced an uninterpretable dataset is a fast failure, and the sprint review exists precisely to catch this. No framework in this article substitutes for scientific judgment.

**Skipping the limitation that evidence base is adjacent.** Formal studies of Scrum and Kanban outcomes concentrate in software development, as the reviewed literature shows [1][2]. The transfer to laboratory research is widely practiced and reasonable, but it is transfer, not direct trial evidence, and a group adopting these methods should expect to evaluate its own results through retrospectives and flow data rather than relying on published effect sizes from other domains.

As with any research practice question, individual circumstances vary, and a conversation with an experienced mentor in your own field remains the most reliable way to pressure-test a choice of method before committing a whole team to it.

## Frequently Asked Questions

### Is Scrum or Kanban better for a PhD student working alone?

Kanban is usually better for a solo PhD student, because Scrum's roles and ceremonies assume a team and a solo student cannot fill them meaningfully. A personal kanban board with a WIP limit of two, a weekly review, and a monthly deep retrospective captures most of the benefit at a fraction of the overhead. If the student's advisor wants fixed check-ins, add a lightweight two-week review rhythm on top of the board rather than adopting full Scrum.

### Can a research lab use Scrum and Kanban at the same time?

Yes, and many do. The common hybrid runs Scrum's sprint planning, sprint review, and retrospective on a fixed cadence while the day-to-day board operates with Kanban's WIP limits and pull system. Combining frameworks is documented practice in software development as well [1]. The hybrid works best when the sprint layer handles commitment and stakeholder review and the Kanban layer handles daily flow and urgent work.

### What counts as a sprint in a research project?

A sprint is any fixed-length work cycle your team commits to, most commonly two weeks. In research, a sprint's scope should be tasks whose completion is within the team's control, such as completing a replicate series, validating a protocol, or producing a figure draft, rather than outcomes that depend on experimental results going a particular way. The sprint review then demonstrates whatever the attempt produced, positive or negative.

### How large must a team be for Scrum to work?

Scrum was designed for teams of roughly three to nine people dedicated to one project. Below three people the roles become redundant and the ceremonies outweigh their value. Above nine people, coordination costs require splitting into multiple teams. A two-person collaboration can still borrow Scrum's sprint review and retrospective without adopting the full framework.

### Do we need special software to run either method?

No. Both methods run on a physical whiteboard with sticky notes, which remains an excellent choice for a co-located lab. Software becomes necessary for distributed teams and for flow metrics, since computing lead time and cycle time by hand is impractical. Any project tool that supports ranked backlogs, iteration grouping, column WIP limits, and cycle time reporting can run either method.

### How do I convert an existing research plan into a board?

Start by decomposing each planned deliverable into tasks that take one to two weeks, then rank those tasks by what unblocks the most downstream work, placing the riskiest experiments earliest. Create three or four columns, such as backlog, in progress, review, and done, and set an in-progress limit you can defend, typically one or two cards per person. Move the first two or three tasks onto the board and hold a short review each week against your milestone calendar.

<script type="application/ld+json">
{
  "@context": "https://schema.org",
  "@type": "FAQPage",
  "mainEntity": [
    {
      "@type": "Question",
      "name": "Is Scrum or Kanban better for a PhD student working alone?",
      "acceptedAnswer": {
        "@type": "Answer",
        "text": "Kanban is usually better for a solo PhD student, because Scrum's roles and ceremonies assume a team and a solo student cannot fill them meaningfully. A personal kanban board with a WIP limit of two, a weekly review, and a monthly deep retrospective captures most of the benefit at a fraction of the overhead. If the advisor wants fixed check-ins, add a lightweight two-week review rhythm on top of the board rather than adopting full Scrum."
      }
    },
    {
      "@type": "Question",
      "name": "Can a research lab use Scrum and Kanban at the same time?",
      "acceptedAnswer": {
        "@type": "Answer",
        "text": "Yes, and many do. The common hybrid runs Scrum's sprint planning, sprint review, and retrospective on a fixed cadence while the day-to-day board operates with Kanban's WIP limits and pull system. Combining frameworks is documented practice in software development as well. The hybrid works best when the sprint layer handles commitment and stakeholder review and the Kanban layer handles daily flow and urgent work."
      }
    },
    {
      "@type": "Question",
      "name": "What counts as a sprint in a research project?",
      "acceptedAnswer": {
        "@type": "Answer",
        "text": "A sprint is any fixed-length work cycle your team commits to, most commonly two weeks. In research, a sprint's scope should be tasks whose completion is within the team's control, such as completing a replicate series, validating a protocol, or producing a figure draft, rather than outcomes that depend on experimental results going a particular way. The sprint review then demonstrates whatever the attempt produced, positive or negative."
      }
    },
    {
      "@type": "Question",
      "name": "How large must a team be for Scrum to work?",
      "acceptedAnswer": {
        "@type": "Answer",
        "text": "Scrum was designed for teams of roughly three to nine people dedicated to one project. Below three people the roles become redundant and the ceremonies outweigh their value. Above nine people, coordination costs require splitting into multiple teams. A two-person collaboration can still borrow Scrum's sprint review and retrospective without adopting the full framework."
      }
    },
    {
      "@type": "Question",
      "name": "Do we need special software to run either method?",
      "acceptedAnswer": {
        "@type": "Answer",
        "text": "No. Both methods run on a physical whiteboard with sticky notes, which remains an excellent choice for a co-located lab. Software becomes necessary for distributed teams and for flow metrics, since computing lead time and cycle time by hand is impractical. Any project tool that supports ranked backlogs, iteration grouping, column WIP limits, and cycle time reporting can run either method."
      }
    },
    {
      "@type": "Question",
      "name": "How do I convert an existing research plan into a board?",
      "acceptedAnswer": {
        "@type": "Answer",
        "text": "Start by decomposing each planned deliverable into tasks that take one to two weeks, then rank those tasks by what unblocks the most downstream work, placing the riskiest experiments earliest. Create three or four columns, such as backlog, in progress, review, and done, and set an in-progress limit you can defend, typically one or two cards per person. Move the first two or three tasks onto the board and hold a short review each week against your milestone calendar."
      }
    }
  ]
}
</script>

## Sources

1. [Agile Methodologies Applied to the Development of Internet of Things (IoT)-Based Systems: A Review.](https://pubmed.ncbi.nlm.nih.gov/36679594/)
2. [Dataset characterizing tailoring techniques, challenges, impacts and metrics in Large-Scale agile development.](https://pubmed.ncbi.nlm.nih.gov/42990633/)