# The Best Meeting Cadence for Research Teams

The best meeting cadence for research teams is the one that matches the rhythm of decisions your project actually makes, not the rhythm of the calendar. A team that needs daily coordination to keep an experiment alive should meet daily, while a consortium of independent sites may do its best work on a monthly cycle with a few well-timed milestones. The rule of thumb is simple: meet as often as your decisions demand, and no more.

This guide walks through the main meeting schedule options for research teams, the pros and cons of each, the criteria that should drive your choice, and worked scenarios you can adapt. It closes with a template for writing your cadence into a research project plan and a list of the mistakes that waste the most meeting time.

## Why Meeting Cadence Is a Research Project Management Decision

In research project management, meetings are not overhead. They are the mechanism by which a team shares data, resolves disagreements, and keeps a study moving toward a deliverable. The cadence you choose determines how fast problems surface, how evenly power is distributed across the team, and how much deep work anyone gets done between meetings.

The evidence on collaborative research points to a few consistent themes. Teams that communicate transparently and show participants that their contributions were used report stronger engagement and better collaboration [1]. Multisite, co-produced projects consistently report that timelines stretch, delays happen, and leaders need to embrace flexibility and plan for those delays rather than pretend a fixed schedule will hold [2]. And in one process evaluation of a team-based workplace intervention, scheduling meetings was itself identified as a key facilitator or barrier to getting the work done [3]. Cadence is a design decision with measurable consequences.

The stakes go up when a team includes members outside the core academic group. Patient partners, community advisors, youth councils, and peer researchers all depend on the meeting schedule to participate meaningfully. Projects that involve these partners well tend to use predictable, accessible, and sometimes flexible schedules, and they treat the schedule itself as part of the research design [4][5][6][7].

## Meeting Schedule Options for Research Teams at a Glance

The table below is the core of this article. Each cadence is explained on its own terms in the sections that follow.

| Cadence | Typical length | Best for | Main advantage | Main drawback |
|--|--|--|--|--|
| Daily check-in (15 min) | 10 to 15 minutes | Short, intense experimental pushes | Unblocks work within hours | Exhausting, collapses into status theater |
| Weekly full-team meeting | 45 to 90 minutes | Active lab or analysis phases | Keeps everyone synchronized on live data | Eats deep work time if agendas drift to logistics |
| Biweekly working meeting | 60 to 90 minutes | Steady-state projects with moderate interdependence | Balances sync and focus time | Slow feedback when a blocker appears in week one |
| Monthly governance or advisory meeting | 60 to 120 minutes | Steering groups, advisory boards, PPI groups | Fits part-time members, builds long-horizon trust | Too slow to resolve operational issues |
| Sprint or intensive cycle | Full days over 2 to 6 weeks | Compressed deliverables such as rapid evidence syntheses | Maximum momentum toward one output | High burnout risk, requires a planning phase |
| Milestone-driven meetings | Varies with milestone | Multi-year programs with distinct phases | Anchors the schedule to real deliverables | Long gaps can hide slow-drifting problems |
| Reflective or retrospective meeting | 45 to 60 minutes | After any major phase, or on a recurring basis | Surfaces process problems while they are fixable | Feels optional, gets cut first when busy |
| Async checkpoint (written update) | 15 to 30 min to read and respond | Geographically dispersed teams | Scheduling flexibility, written record | Weak for disagreement and creative work |

## Option 1: Daily Check-Ins

A daily check-in is a short, standing meeting, often 10 to 15 minutes, where each person states what they are working on, what is blocked, and what changed since yesterday. This cadence fits narrow windows of intense work: a final week before a grant submission, a data collection push with a hard endpoint, or the intensive phase of a compressed review.

The evidence for intensive cycles comes largely from rapid evidence synthesis work. In one pilot, organizations compressed what is normally a four to six month review process into six weeks, and they made it work by dividing the project into a planning phase and an intensive phase, forming small teams with a dedicated team lead and a process lead, and holding reflective meetings throughout to evaluate and adjust the process as needed [8]. Daily or near-daily contact is what makes that kind of cadence survivable, because problems that would sit unresolved for a week under a weekly schedule get surfaced within a day.

**Pros:** Fast unblocking, high shared awareness, natural fit with deadline-driven work.

**Cons:** High overhead for teams whose members work independently, risk of turning into a ritual with no decisions, and unsuitable for teams that include part-time or community members who cannot attend daily.

**Use it when:** The team shares one deliverable with a deadline inside a few weeks and blockers emerge faster than a weekly cycle can absorb them.

## Option 2: Weekly Full-Team Meetings

The weekly meeting is the default heartbeat of most research groups. In a weekly schedule for research teams, everyone who touches the project meets for 45 to 90 minutes to review new data, plan the coming week, and assign action items.

The quality of a weekly meeting depends far more on what the team spends its time on than on the fact that it happens every week. In a study of secondary school teacher teams, teams that adopted structured materials spent more meeting time discussing actual teaching practice and less time discussing logistics and mechanics, compared with teams continuing typical practice [9]. The same principle transfers directly to research teams: a weekly slot filled with equipment bookings and conference travel approvals is a wasted slot, while one built around a data figure or a manuscript draft is usually the highest-value hour of the week.

**Pros:** Tight feedback loop for active projects, natural home for data review, easy to anchor other rituals around it such as journal clubs.

**Cons:** Can crowd out the concentration time research depends on, and the pace encourages shallow discussion of complex problems that deserve more than a slot between other agenda items.

**Use it when:** Multiple people touch the same live dataset, protocol, or manuscript every week, and decisions stall when the whole group is not in the room.

## Option 3: Biweekly and Monthly Working Meetings

Reducing the frequency of the working meeting is the most common adjustment teams make as a project matures. A biweekly or monthly schedule suits projects in steady state, where the rate of new results does not justify weekly contact.

Monthly meetings are the documented norm for governance and advisory structures in research. A patient and public involvement resource group embedded in a French cancer prevention department held nine monthly meetings plus additional task work over its first year, and used the first two meetings to co-develop its mission statement, engagement charter, and annual action plan [10]. A co-design study across four UK rheumatology centers had its steering group meet monthly while the heavy lifting happened in workshops between meetings [11]. And an advisory group of lived-experience researchers working on aging and homelessness deliberately scheduled its meetings on the same day and time each month, which the group identified as a key practice for sustaining participation [7].

**Pros:** Respectable cost in calendar time, predictable rhythm that part-time members can plan around, enough spacing for real work to accumulate between sessions.

**Cons:** A two-week-old blocker waits too long, and monthly meetings accumulate long agendas that no 90-minute slot can process honestly.

**Use it when:** The project has crossed out of its startup phase, most members work semi-independently, or the team includes advisors and partners who contribute expertise rather than day-to-day labor.

## Option 4: Sprint and Intensive Cycles

Some projects invert the model. Instead of a light recurring meeting, they schedule a bounded intensive period with dense contact and a defined finish line. This is the cadence of choice for rapid responses to commissioning bodies, grant resubmissions, and conference deadline pushes.

The six-week evidence synthesis pilot is the clearest documented example. The team spent a full planning phase scheduling the intensive phase, exploring new digital tools, and identifying peer reviewers before the clock started. During the intensive phase, each review team had a team lead, a process lead, and a leadership contact point, and the teams used reflective meetings to evaluate and adjust their own process in real time. When they found significant uncertainties about scopes, research questions, and inclusion criteria, they brought forward their engagement with commissioners to resolve those points before committing to the protocol [8].

The lesson generalizes: an intensive cadence works only when the surrounding structure absorbs the friction. Team leads, pre-committed scope, and scheduled reflection are not extras. They are the load-bearing parts of the schedule.

**Pros:** Extraordinary momentum, clear end date, decisions get made because there is no later.

**Cons:** Real burnout risk, unforgiving of scope confusion, and impossible to sustain for more than a few weeks at a time.

**Use it when:** A commissioner, funder, or deadline sets a hard, short timeline and leadership is willing to shield the team from other obligations during the sprint.

## Option 5: Milestone-Driven Meetings

Large collaborative programs, especially those spanning institutions and years, often anchor their meeting schedule to milestones rather than to the calendar. The DOLF project, a 15-year research program on eliminating parasitic diseases that has run clinical trials across 11 countries, identified its research needs through meetings of experts, and those meetings shaped the study design that followed [12]. The meetings exist because a decision point exists, not because a week has elapsed.

A milestone-driven meeting schedule for research teams typically includes a kickoff meeting to align goals and roles, phase-gate meetings at the close of each major work package, and a closing meeting for dissemination planning. Multisite implementation research reinforces the value of this structure, finding that collaborative strategies linking local teams, across sites, and between initiative developers and users are central to whether multisite initiatives succeed [13].

**Pros:** Meetings carry genuine decision weight, senior and external participants can commit to a small number of high-value dates, and the schedule mirrors the project plan.

**Cons:** Long gaps between milestones can let slow problems drift unnoticed, so milestone cadence almost always needs a lightweight pulse between gates.

**Use it when:** The project is multi-year, multi-institutional, or organized in defined work packages with formal deliverables.

## Option 6: Reflective Meetings and Retrospectives

A reflective meeting is a scheduled session in which the team examines its own process rather than its scientific content. The practice appears repeatedly in well-run projects. The six-week evidence synthesis teams built reflective meetings into their schedule specifically to evaluate and adjust their process [8]. A qualitative process evaluation of participatory oncology research drew on reflective group discussions, meeting documentation, and researcher reflections to understand what helped and hindered meaningful participation [1]. An evaluation of a training program for heart failure shared medical appointments drew on minutes from debrief and training team meetings as part of its evidence base [14].

The practical version for any team is a 45 to 60 minute retrospective at the end of each project phase, or quarterly on long projects, asking three questions: what should we keep, what should we change, and what did we promise each other that we did not do.

**Pros:** Converts process friction into schedule adjustments while the project can still benefit, and it is the single cheapest intervention for improving a cadence that is not working.

**Cons:** Gets cancelled first under deadline pressure, which is exactly when it is most useful.

**Use it when:** Any cadence change, hiring wave, or partner onboarding has recently occurred, or on a fixed rhythm of once per phase.

## Option 7: Virtual and Asynchronous Formats

Virtual meetings changed the calculus of cadence because they lowered the cost of bringing people together. A scoping review of virtual nominal group technique sessions in healthcare research, a structured consensus method with stages for idea generation, round-robin sharing, clarification, and voting, found that most studies ran successfully on platforms such as Zoom and Microsoft Teams, and among authors surveyed, 80 percent judged the virtual format comparable or superior to in-person meetings. The review also noted advantages including inclusion of geographically dispersed participants, scheduling flexibility, and cost savings [15].

Virtual formats can also raise attendance rather than lower it. When a community research advisory council at Johns Hopkins University had to abandon in-person meetings during the pandemic, the council conducted a needs assessment, provided individualized technical support, and saw attendance among community members rise from 69 percent to 76 percent after the transition to virtual operation [16].

Asynchronous checkpoints, meaning written updates circulated with a response deadline, extend this flexibility. They work best for status reporting and document review, and worst for negotiation, brainstorming, and resolving disagreement.

**Pros:** Removes travel as a barrier, widens who can participate, creates a searchable written record.

**Cons:** Requires deliberate facilitation to prevent the loudest voices from dominating, harder to build trust in new teams, and the review literature notes that many studies do not report their adaptations, which makes lessons harder to transfer.

**Use it when:** Participants are dispersed, budgets exclude regular travel, or the meeting format is a structured method such as a consensus exercise that translates well to a shared-screen workflow.

## The Criteria That Decide Real Choices

Understanding each option on its own terms is half the decision. The other half is comparing them on the criteria that actually differ between teams.

### Decision Density

Count the decisions your project makes per week that require more than one person. Lab work in an active phase can generate several such decisions daily. A steering group may face one genuine decision per month. Match the cadence to the count. A team that meets weekly but makes one real decision per month is paying a weekly tax for monthly value, and the surplus meeting time usually fills with logistics, which is exactly the pattern that separates productive teams from unproductive ones [9].

### Team Composition

A meeting schedule for research teams that includes patient partners, community advisors, youth councils, or peer researchers has to work for them, not only for salaried staff. Across participatory projects, the recurring recommendations are consistent: create a flexible schedule of communication that accommodates members' circumstances and, where relevant, symptoms [4], schedule on the same day and time each month so participation becomes predictable [7], and give explicit attention to meeting logistics and psychological safety so that less powerful members can actually influence the work [6]. Teams supporting members with disabilities add that flexibility, open communication about needs, and planning for time away due to illness are required for equitable contribution [17].

### Timeline Honesty

Co-produced and convergent research projects report a consistent finding: real timelines expand, and leaders who embrace that reality, plan for delays, and build flexibility into the schedule produce better outcomes than leaders who enforce a fiction [2]. A cadence that assumes no delays is not a schedule, it is a wish. Build slack between milestones rather than stacking them back to back.

### Early and Visible Engagement

Two practices recur in evaluations of successful collaborative schedules. First, involve participants early. Participatory oncology research found that early involvement, transparent communication, and visible use of contributions supported meaningful participation [1]. Second, close the loop in the meeting itself, showing members how their previous input changed the work, which is the mechanism that sustains attendance and trust across a long meeting series [1][18].

## Worked Scenarios

### Scenario 1: A five-person academic lab with an active R01-style project

Three postdocs and students share a live dataset and one animal or cell model pipeline. Decisions about reagents, analysis branches, and trouble-shooting come up several times a week. The best meeting schedule here is a weekly 90-minute full-team data meeting with a standing agenda that starts with a figure, plus a 15-minute optional daily check-in during experimental pushes. A monthly retrospective closes each experimental phase. Weekly works because the decision density is high and everyone is full-time on the project.

### Scenario 2: A co-produced, multisite community research grant

The team includes academic investigators at three universities, a practitioner organization, and a community advisory board. The documented experience of comparable projects says to expect an expanded timeline, plan for delays, use inclusive communication practices, and support boundary spanners, meaning individuals who bridge the academic and community worlds [2]. A cadence that fits: monthly full-project meetings on a fixed day and time [7], a separate monthly steering call for the core decision-makers [11], a quarterly meeting with the community advisory board scheduled around their availability and supported with technical help [16], and written async updates between meetings. Milestone reviews anchor each phase.

### Scenario 3: A rapid evidence synthesis with a six-week commission

Follow the documented pilot structure. Run a planning phase first, where the team schedules the intensive phase, tests the digital tools, and resolves scope questions with the commissioner before the clock starts [8]. During the six intensive weeks, hold short daily team stand-ups plus a weekly reflective meeting where each team, supported by a team lead and a process lead, evaluates and adjusts its own process [8]. Reserve one session per week for decisions that need the commissioner, so the schedule creates engagement rather than blocking it.

## Building the Cadence Into a Research Project Plan Template

![Five ordered steps for writing a meeting cadence into a research project plan, from meeting inventory through escalation path.](/article-images/illustrations/meeting-schedule-for-research-teams-plan-template-steps.webp)

A research project plan template is only useful if the meeting schedule is explicit. Include the following elements whenever you adapt a template for your own project.

1. **Meeting inventory.** List every recurring meeting, its purpose, its attendees, its frequency, and its length. If a meeting has no purpose you can state in one sentence, cancel it.
2. **Decision map.** For each meeting, state which decisions it owns. Meetings that own no decisions become status broadcasts, and status is better handled asynchronously.
3. **Calendar anchors.** For each recurring meeting, fix the day and time. Fixed anchors are particularly important for part-time and community members who plan around other commitments [7].
4. **Phase structure.** Divide the project into a planning phase and working phases, and assign a cadence to each. Intensive phases get denser meetings, steady phases get lighter ones [8].
5. **Reflection points.** Schedule retrospectives at each phase boundary, not as an optional extra [8].
6. **Slack.** Add explicit buffer between milestones. Co-produced projects that planned for delays outperformed those that did not [2].
7. **Participation supports.** Record what each member needs to participate, from technology support to accommodation requests to flexible timing [4][16][17].
8. **Escalation path.** Name who can call an unscheduled meeting when a blocker cannot wait for the next slot.

## Common Mistakes and Limitations

- **Copying another lab's cadence.** A weekly schedule that fits a five-person wet lab will strangle a ten-institution consortium, and vice versa. Cadence follows decision density, which differs by an order of magnitude across project types.
- **Letting logistics swallow the meeting.** Teams that spend their meeting time on scheduling and mechanics rather than on the substance of their work lose the main benefit of gathering [9]. Push logistics to email or a shared document.
- **Treating the schedule as fixed once set.** Projects change phases. A cadence adopted at kickoff and never revisited is a mismatch by mid-project. Schedule the review of the schedule.
- **Assuming community and patient partners can attend whenever scientists can.** Participation fails when schedules ignore members' work hours, health conditions, caregiving duties, or need for digital support. Successful projects assess needs and adapt [16][17].
- **Running intense sprints without a planning phase.** The documented six-week pilot succeeded because scope, tools, and reviewer recruitment were settled before the intensive period began [8]. Skipping that step is the most common way rapid projects fail.
- **Confusing meeting frequency with productivity.** More meetings do not mean more progress. The number of structured meetings a team completes matters less than what the meetings contain, a pattern observed directly in team-based intervention research [9].
- **Choosing a format without asking the participants.** Virtual formats work well for many consensus and advisory tasks and can increase attendance when support is provided, but they require deliberate facilitation and honest reporting of adaptations [15][16].

One limitation applies to everything above. Cadence evidence comes largely from process evaluations of specific projects in participatory health research, implementation science, and education. The patterns are consistent, but your project's funding terms, institutional requirements, and team circumstances will shape what is actually feasible, and individual projects need their own judgment and, where relevant, consultation with their institutions.

## Frequently Asked Questions

### How often should a research team meet?

Meet as often as your project makes shared decisions, and no more. Active lab phases usually justify weekly meetings, steady-state projects often do well biweekly or monthly, and advisory or governance groups commonly meet monthly, as documented in patient involvement and co-design projects [10][11][7].

### Should we meet weekly or biweekly?

![Comparison table of weekly and biweekly working meetings by length, best use, feedback speed, and main drawback.](/article-images/illustrations/meeting-schedule-for-research-teams-weekly-vs-biweekly.webp)

Choose weekly when multiple people touch the same live work every week and decisions stall without the group, and biweekly when members work semi-independently and weekly meetings have drifted into status updates. Review the choice at each project phase rather than keeping it permanently.

### How long should research team meetings be?

Most working meetings run 45 to 90 minutes, and structured co-design meetings average around 80 minutes [18]. Short daily check-ins of 10 to 15 minutes suit sprint phases. Length should follow the agenda, not the other way around.

### How do we include patient or community partners in the meeting schedule?

Schedule on a fixed day and time each month, ask partners about their constraints before fixing the calendar, provide technical support for virtual attendance, protect time for personal updates, and show visibly how their input changed the project [1][16][7].

### Are virtual meetings as effective as in-person ones for research teams?

For many structured tasks, yes. In a survey of authors who ran virtual consensus meetings, 80 percent judged the virtual format comparable or superior to in-person, with advantages in scheduling flexibility and reach [15]. Virtual transition can even raise attendance when needs are assessed and support provided [16].

### How do I write the meeting cadence into a research project plan?

Add a meeting inventory with purpose, attendees, frequency, and length, assign decisions to each meeting, fix calendar anchors, split the project into phases with a cadence for each, schedule retrospectives at phase boundaries, and build in slack for delays [2][8].

<script type="application/ld+json">
{
  "@context": "https://schema.org",
  "@type": "FAQPage",
  "mainEntity": [
    {
      "@type": "Question",
      "name": "How often should a research team meet?",
      "acceptedAnswer": {
        "@type": "Answer",
        "text": "Meet as often as your project makes shared decisions, and no more. Active lab phases usually justify weekly meetings, steady-state projects often do well biweekly or monthly, and advisory or governance groups commonly meet monthly, as documented in patient involvement and co-design projects."
      }
    },
    {
      "@type": "Question",
      "name": "Should we meet weekly or biweekly?",
      "acceptedAnswer": {
        "@type": "Answer",
        "text": "Choose weekly when multiple people touch the same live work every week and decisions stall without the group, and biweekly when members work semi-independently and weekly meetings have drifted into status updates. Review the choice at each project phase rather than keeping it permanently."
      }
    },
    {
      "@type": "Question",
      "name": "How long should research team meetings be?",
      "acceptedAnswer": {
        "@type": "Answer",
        "text": "Most working meetings run 45 to 90 minutes, and structured co-design meetings average around 80 minutes. Short daily check-ins of 10 to 15 minutes suit sprint phases. Length should follow the agenda, not the other way around."
      }
    },
    {
      "@type": "Question",
      "name": "How do we include patient or community partners in the meeting schedule?",
      "acceptedAnswer": {
        "@type": "Answer",
        "text": "Schedule on a fixed day and time each month, ask partners about their constraints before fixing the calendar, provide technical support for virtual attendance, protect time for personal updates, and show visibly how their input changed the project."
      }
    },
    {
      "@type": "Question",
      "name": "Are virtual meetings as effective as in-person ones for research teams?",
      "acceptedAnswer": {
        "@type": "Answer",
        "text": "For many structured tasks, yes. In a survey of authors who ran virtual consensus meetings, 80 percent judged the virtual format comparable or superior to in-person, with advantages in scheduling flexibility and reach. A virtual transition can even raise attendance when needs are assessed and support is provided."
      }
    },
    {
      "@type": "Question",
      "name": "How do I write the meeting cadence into a research project plan?",
      "acceptedAnswer": {
        "@type": "Answer",
        "text": "Add a meeting inventory with purpose, attendees, frequency, and length, assign decisions to each meeting, fix calendar anchors, split the project into phases with a cadence for each, schedule retrospectives at phase boundaries, and build in slack for delays."
      }
    }
  ]
}
</script>

## Sources

1. [Enabling meaningful participation and involvement in oncology and palliative care research: insights from two participatory research projects.](https://pubmed.ncbi.nlm.nih.gov/42983444/)
2. [Navigating the practice of co-produced convergence research: Lessons from projects funded by NSF's Coastlines and People (CoPe) program.](https://pubmed.ncbi.nlm.nih.gov/43011587/)
3. [An Organizational-Level Intervention to Enhance Sustainable Employability of Long-Term Care Workers: A Process Evaluation of the Healthy Working Approach.](https://pubmed.ncbi.nlm.nih.gov/40245406/)
4. [Community-Engaged Recommendations for Empowering People Living With Dementia to be Research Collaborators.](https://pubmed.ncbi.nlm.nih.gov/37061845/)
5. [Stroke survivors partner in research: a case example of collaborative processes.](https://pubmed.ncbi.nlm.nih.gov/36088341/)
6. [Reflecting on Youth Participation in Mental Health Research: Lessons From the Consell de Joves in Catalonia.](https://pubmed.ncbi.nlm.nih.gov/42974961/)
7. ["We Need To Be at the Table": Collaboration with Lived Experts.](https://pubmed.ncbi.nlm.nih.gov/39925282/)
8. [Conducting two evidence syntheses in six weeks - experiences with and evaluation of a pilot project.](https://pubmed.ncbi.nlm.nih.gov/39285338/)
9. [Integrating Research-Supported Coaching Practices Into Secondary Teachers' Team Meetings: Early Indications of Potential to Impact Collaborations, Classroom Interactions, and Student Engagement.](https://pubmed.ncbi.nlm.nih.gov/36686153/)
10. [Patient and public involvement in a cancer prevention research department: lessons learned from the DIADEME group.](https://pubmed.ncbi.nlm.nih.gov/43004484/)
11. [Development of patient-initiated follow-up resources for UK rheumatology departments: a co-design study with patient and clinician collaboration.](https://pubmed.ncbi.nlm.nih.gov/41881636/)
12. [The Death to Onchocerciasis and Lymphatic Filariasis (DOLF) project: Accomplishments and ongoing research.](https://pubmed.ncbi.nlm.nih.gov/41632749/)
13. [Guiding principles for effective collaborative implementation strategies for multisite hospital improvement initiatives: a mixed-method realist evaluation of collaborative strategies used in four multisite initiatives at public hospitals in New South Wales, Australia.](https://pubmed.ncbi.nlm.nih.gov/37286318/)
14. [Training providers to implement heart failure shared medical appointments: A qualitative evaluation.](https://pubmed.ncbi.nlm.nih.gov/39565818/)
15. [The use of virtual nominal groups in healthcare research: An extended scoping review.](https://pubmed.ncbi.nlm.nih.gov/38865305/)
16. [Digital and virtual strategies to advance community stakeholder engagement in research during COVID-19 pandemic.](https://pubmed.ncbi.nlm.nih.gov/36285018/)
17. [Creating disability-inclusive research cultures: Opportunities, challenges, and recommendations for best practices in supporting peer researchers.](https://pubmed.ncbi.nlm.nih.gov/42957461/)
18. [Co-designing interventions to improve emergency department discharge communication with youths, parents and healthcare providers: a process evaluation.](https://pubmed.ncbi.nlm.nih.gov/40600235/)